Each site’s documents, up to date.

The drawings, diagrams and manuals for each site are filed with their versions, and only the latest opens in the field. The as-built file arrives in a jumble when a job is handed over; Auragide files it by site and by piece of equipment, and finds it in a couple of words.

+€2 per office account per month

The Lunel plant’s documents in Auragide: thirteen documents in nine sections, the as-built file uploaded, then each document with its section, its current version and its upload date.
The 20 kV substation single-line diagram on a phone: only version 3, the current one, opens.The 20 kV substation single-line diagram on a phone: only version 3, the current one, opens.
Screenshots from November 2026 Unretouched screenshots from the sandbox, where the software is in French. The company, the people and the dates are made up. Try the module in the sandbox, no meeting needed

What the module does.

The features available today, set up with you during onboarding.

  1. 1

    Each site’s as-built file, uploaded in one go, as a folder, as files or as a ZIP archive, and filed by section: diagrams, manuals, acceptance reports, certificates. Auragide suggests the section and the equipment for each file; you correct them before filing.

  2. 2

    Versions of each document: the old one can still be viewed at the office, only the latest opens on the phone.

  3. 3

    Search by keywords in titles, sections, sites and equipment, such as “Lunel single-line diagram” or “clinic inverter manual”.

  4. 4

    Documents linked to the equipment in the asset register, opened from its QR label.

  5. 5

    Documents requested by an auditor or a client, found in a few seconds.

Row of red binders on a shelf
Binders on a shelf. An as-built file often fills two or three of them per site.

Example

Wednesday 14 October 2026, 8:20 am

Delivery substation at the Lunel plant, with Électricité Vidal & Fils

At the foot of the substation, the June version.

Before isolating cell T2, Inès Laurent opens the substation’s single-line diagram on her phone. It is version 3, uploaded on 2 June after the metering was modified.

Version 2 was still going around as a PDF in two vans. It can still be viewed at the office, but the phone no longer offers it.

A made-up example to show how it works: the company, people, dates and figures are fictitious.

Try the module in the sandbox, no meeting needed

VFSite documents ›Lunel plant

13 documents9 sectionsAs-built file uploaded on 28/05/2019

DocumentVersionUploaded on
20 kV substation single-line diagramv3, current02/06/2026
20 kV substation single-line diagramv2, superseded17/09/2024
Protection relay manualv1, current11/08/2026
Site plan and accessv2, current06/01/2026

The Lunel plant’s documents, seen from the office. On the phone, only the current versions open.

The modules that go with this one.

They share the same sites, the same equipment and the same people: what is entered in one shows up in the other.

The full catalogue

  • Assets and equipment

    One QR label per piece of equipment; scan it and its record opens with its history and what it contains.

  • Prevention plans

    The register of all your prevention plans, whatever tool the client uses: uploaded or forwarded by email, signed by your workers on their phones, ready for the audit.

  • Statutory inspections

    Fire extinguishers, fire safety systems, electrical installations: every inspection due, site by site, with its due date and its report.

This module: €2 more per office account, €2 per technician.

The As-built files and site documents module adds €2 per office account and €2 per technician, each month, to the core. The core costs €23.99 per office account and €19.99 per technician, each month. The price never exceeds €43.99 per office account and €39.99 per technician: from the 10th module, the whole catalogue is included, future modules too.

Calculate the price with this module

A first one-hour meeting.

With your spreadsheets, paperwork or emails to hand. We look together at what the module would take over, then the quote follows in writing.