Skip to content
Try itBook a meetingMeeting

ModulesSafety and compliance

Every inspection has its due date, site by site.

Every periodic inspection has its due date, site by site, and stays red until it is done. Extinguishers, fire alarm systems, smoke extraction, emergency lighting, electrical installations: the year’s schedule is built from the equipment on each site, its frequency and your contracts.

+€2 per office account per month

The November inspections in Auragide: three done out of eight, two overdue at two sites, two planned this week, one to schedule, one to review, then what each technician has done and what is left for them.
The fire safety system visit at the Les Tamaris care home on a phone: sent on 17/11/2026, carried out by Yanis Morel from 9:15 to 11:40 am, signed by Mr Garnier at 11:48 am.The fire safety system visit at the Les Tamaris care home on a phone: sent on 17/11/2026, carried out by Yanis Morel from 9:15 to 11:40 am, signed by Mr Garnier at 11:48 am.
Screenshots from November 2026 Unretouched screenshots from the sandbox, where the software is in French. The company, the people and the dates are made up. Try the module in the sandbox, no meeting needed

What the module does.

The features available today, set up with you during onboarding.

  1. 1

    The year’s inspection schedule, calculated from each piece of equipment’s frequency and the date of the last visit; with the Maintenance contracts module, the contract’s frequency is applied in a single step.

  2. 2

    The month’s inspections by technician and by site, with what remains to be done, what has been postponed and why, and the sites running late.

  3. 3

    On-site entry, even with no signal: points checked, measurements, parts replaced, photos, and the client’s signature, or its absence with the reason.

  4. 4

    The inspection report on your letterhead, checked by the office then sent to the client via a link, with a copy in the site’s safety register.

  5. 5

    Defects found, opened as findings on the equipment and tracked until the follow-up visit, with the Findings and actions module.

Rows of red fire extinguishers on the floor along a wall, behind a barrier
Portable extinguishers lined up. Each one has the date of its last service; Auragide works out the next due date from it.

The regulations this module helps you meet.

Each reference links to its official source, in French. The module helps you meet these obligations; it does not replace reading the text.

The texts

  • French Labour Code, art. R4226-16 and R4226-19

    The employer has its electrical installations inspected periodically and records the results in a register.

    Source: Légifrance, opens in a new tab
  • Order of 26 December 2011, art. 3

    The periodic inspection takes place every year; the interval can be extended to two years, under certain conditions.

    Source: Légifrance, opens in a new tab
  • French Labour Code, art. R4227-39

    The fire safety instructions provide for periodic tests and inspections of the equipment; tests take place at least every six months and their date is recorded in a register.

    Source: Légifrance, opens in a new tab

What you may be asked for

  • The latest electrical installation inspection report, less than a year old, or less than two years old where the interval has been extended.
  • The electrical inspection register, with the work done to correct the defects found.
  • The dates of the fire equipment tests, and the observations they produced.

What the module gives you

The module calculates each due date from the equipment’s frequency and the last visit, and files a copy of each approved report in the site’s safety register, with the closure of each defect.

References checked on 16 November 2026 on Légifrance.

Example

Monday 26 October 2026, 7:30 am

Sécurifeu Méditerranée branch, Sète

Fourteen inspections to do in five days.

Nadia Ferrand, branch manager, opens the October inspections before the 8 am meeting: 104 done out of 118. Two sites are red, a shop that has postponed twice and a car park whose access badge never arrived.

Sonia Pagès, project manager, calls both customers before 8:30 am. On Friday at 4:45 pm, the dashboard shows 118 out of 118.

A made-up example to show how it works: the company, people, dates and figures are fictitious.

Try the module in the sandbox, no meeting needed

SMInspections ›October 2026104 done out of 118

104 done12 planned this week2 overdue

SiteInspectionTechnicianStatus
Les Tamaris care home, FrontignanCategory A fire safety system, annualJ. AbadieTuesday 27, 9:15 am
Shop, Balaruc-les-BainsExtinguishers, 46 unitsF. CastanPostponed twiceRescheduled Thursday 29, 8 am
Station car park, SèteEmergency lightingF. CastanAccess badge missingBadge promised Thursday
Hôtel du Môle, SèteExtinguishers, 22 unitsJ. AbadieDone on 23/10

The October inspections, Monday 26 at 8:35 am, after Sonia Pagès’s two calls.

The modules that go with this one.

They share the same sites, the same equipment and the same people: what is entered in one shows up in the other.

The full catalogue

  • Visit reports

    The report starts from the work order or the inspection, is checked at the office and comes out as a PDF on your letterhead, ready to send to the client.

  • Findings and actions

    Every non-conformity found on a site becomes an action, with an owner and a due date, tracked until it is closed.

  • Assets and equipment

    One QR label per piece of equipment; scan it and its record opens with its history and what it contains.

This module: €2 more per office account, €2 per technician.

The Statutory inspections module adds €2 per office account and €2 per technician, each month, to the core. The core costs €23.99 per office account and €19.99 per technician, each month. The price never exceeds €43.99 per office account and €39.99 per technician: from the 10th module, the whole catalogue is included, future modules too.

Calculate the price with this module

A first one-hour meeting.

With your spreadsheets, paperwork or emails to hand. We look together at what the module would take over, then the quote follows in writing.