All your prevention plans, in one place.
Every client sends you its prevention plans in its own way. Auragide files them in a single register, checks each worker’s authorisations and collects their signatures, even with no signal.
+€2 per office account per month

What the module does.
The features available today, set up with you during onboarding.
- 1
A single register, whatever tool the client uses: you upload the PDF you received, or forward it by email to that client’s address. The dates are read from the PDF and suggested; you confirm.
- 2
A check at assignment: when you add a technician to the plan, Auragide tells you straight away if they lack a required authorisation, or if it expires before the plan ends.
- 3
Each worker signs on their phone, with a finger, even with no signal; a temp worker without an account signs by scanning the plan’s QR code.
- 4
Reminders 30 and 7 days before a plan ends, sent to the site manager.
- 5
The audit export (MASE, client, inspectorate), as a dated PDF with the signatures, and a proof link for the client, with no account needed and limited in time.
A sample audit export, signatures included.
The prevention plan register as the software produces it for a MASE audit, a client or the labour inspectorate: each plan, its workers, the authorisations required and their signatures, to the minute.
Taken from the sandbox: the company and the people are made up. Six of the seven signatures were made by QR code, with no account, as a temp worker would.
The same export, to produce yourself: open the sandbox.

The regulations this module helps you meet.
Each reference links to its official source, in French. The module helps you meet these obligations; it does not replace reading the text.
The texts
French Labour Code, art. R4512-7
The prevention plan is drawn up in writing and agreed before work starts once the work reaches 400 hours over twelve months, or as soon as a task appears on the list of hazardous work.
Source: Légifrance, opens in a new tabOrder of 19 March 1993, hazardous work
The list of such work, including work exposing people to exposed live parts above extra-low voltage.
Source: Légifrance, opens in a new tabFrench Labour Code, art. R4512-12
The plan is kept available to the labour inspectorate for as long as the work lasts.
Source: Légifrance, opens in a new tab
What you may be asked for
- The written prevention plan, agreed with the host company before the first day of work.
- The same plan, produced for as long as the work lasts.
- The instructions to be given to your workers, which the plan must contain.
What the module gives you
The module files all your plans in a single register, whatever tool the client uses, and produces the dated audit export from it, with your workers’ signatures.
References checked on 16 November 2026 on Légifrance.
Example
Monday, 4:05 pm
Office of the project manager at a made-up electrical contractor
A plan received by email, signed the next morning.
The prevention plan for replacing the inverters arrives as a PDF from the plant operator. The project manager forwards it to that client’s Auragide address: the plan appears as a draft, with its dates read from the PDF.
He adds three technicians. For one of them, an orange line: his B1V authorisation expires before the plan ends. He replaces him before confirming.
On Tuesday morning, at the delivery substation, the workers sign on their phones, with no signal; the signatures upload once they step outside. The audit register shows them with their times.
A made-up example to show how it works: the company, people, dates and figures are fictitious.
- Site
- Lunel solar plant, 20 kV delivery substation
- Works
- Lockout of cell T2, replacement of the protection relay
- Date
- Wednesday 14/10/2026, 8 am to 12 pm
- Worker
- Inès Laurent, H2V B2V BR BC until 02/03/2027 Valid
- Risks
- 4 identified: exposed live parts, co-activity with the grounds team, on-site traffic, dust
- Validity
- Until 31/12/2026, reminder on 01/12
- 10:53 amPDF sent to Inès Laurent and Mr Lefèvre
- 10:52 amSigned by Mr Lefèvre
- 10:05 amJoint inspection started, 2 participants
The same prevention plan in Auragide, Tuesday 13 October at 10:53 am. Time from inspection to signature: 47 minutes.
Prevention plans module · try it
Sign in place of a worker.
The plan for the delivery substation at the Lunel solar plant is waiting for just one signature, a worker’s. On their phone it takes ten seconds, even with no signal. Example: made-up company and people.
Sign in the box, with your finger or the mouse, then confirm: the plan switches to “ready”, at the current time.
Plant delivery substation, Lunel
Replacement of the HV cell, Thursday 5 November
- Team leaderMon 2 Nov
4:12 pmÉlectricité Vidal & Fils - Works supervisorMon 2 Nov
4:15 pmÉlectricité Vidal & Fils - Field technicianchased at 7:30 amTo sign: that’s you
The modules that go with this one.
They share the same sites, the same equipment and the same people: what is entered in one shows up in the other.

Authorisations
Every certificate has its expiry date, and reminders go out 60 and 15 days before, to the person and their manager.

Findings and actions
Every non-conformity found on a site becomes an action, with an owner and a due date, tracked until it is closed.

As-built files and site documents
As-built files, diagrams and manuals, filed by site with their versions; in the field, only the latest one opens.
This module: €2 more per office account, €2 per technician.
The Prevention plans module adds €2 per office account and €2 per technician, each month, to the core. The core costs €23.99 per office account and €19.99 per technician, each month. The price never exceeds €43.99 per office account and €39.99 per technician: from the 10th module, the whole catalogue is included, future modules too.
A first one-hour meeting.
With your spreadsheets, paperwork or emails to hand. We look together at what the module would take over, then the quote follows in writing.