The visit report goes out the same day.
The visit report is written on site and sent to the client the same day, on your letterhead. What the technician entered during the visit fills in the report; the office checks it, approves it and sends it.
+€2 per office account per month



What the module does.
The features available today, set up with you during onboarding.
- 1
Your report templates by type of visit, taken from your current Word templates; a PDF or paper template is copied on screen.
- 2
The report pre-filled with the site, the equipment, the points checked and the photos from the visit; the technician writes it on site, even with no signal.
- 3
Checking and approval at the office before sending, with the corrections noted.
- 4
The PDF on your letterhead, sent to the client via a link, with the list of remarks; a corrected version goes out as the next revision, and the old one stays in the register.
- 5
With the Findings and actions module, the remarks in the report opened as findings and tracked until they are closed.

Example
Tuesday 27 October 2026, 2:10 pm
Les Tamaris care home, Frontignan, with Sécurifeu Méditerranée
A care home’s report, sent two and a half hours later.
Julien Abadie enters each point of the annual inspection on the tablet: the control panel, 86 detectors, the manual call points, the fire doors. The care home’s technical manager signs at 11:48 am.
Sonia Pagès reviews the report at the office and sends it at 2:10 pm. In 2025, an inspection report went out on average nine days after the visit.
A made-up example to show how it works: the company, people, dates and figures are fictitious.
- Site
- Les Tamaris care home, Frontignan, 84 beds
- Visit
- Annual inspection of the category A fire safety system
- Technician
- Julien Abadie, 27/10, from 9:15 to 11:40 am
- Checked
- Control panel, 86 detectors, 12 manual call points, 9 fire doors, 2 smoke vents
- Remarks
- 2, opened as findings: EC-0291 and EC-0292
- Signed
- Mr Garnier, technical manager, at 11:48 am
- 2:10 pmPDF sent to the care home, copy to the safety register
- 1:55 pmReviewed and approved by Sonia Pagès
- 11:48 amSigned on the tablet by Mr Garnier
The Les Tamaris care home report, Tuesday 27 October at 2:10 pm, two and a half hours after the end of the visit.
The modules that go with this one.
They share the same sites, the same equipment and the same people: what is entered in one shows up in the other.

Statutory inspections
Fire extinguishers, fire safety systems, electrical installations: every inspection due, site by site, with its due date and its report.

Findings and actions
Every non-conformity found on a site becomes an action, with an owner and a due date, tracked until it is closed.

Work orders
The work order is filled in on the phone, even with no signal, and closed on site with the client’s or technician’s signature, and the photo where needed.
This module: €2 more per office account, €2 per technician.
The Visit reports module adds €2 per office account and €2 per technician, each month, to the core. The core costs €23.99 per office account and €19.99 per technician, each month. The price never exceeds €43.99 per office account and €39.99 per technician: from the 10th module, the whole catalogue is included, future modules too.
A first one-hour meeting.
With your spreadsheets, paperwork or emails to hand. We look together at what the module would take over, then the quote follows in writing.