A guided tour of Auragide, in eight screens.
The week at Électricité Vidal & Fils, in Nîmes, from 12 to 16 October 2026: you click where the team clicked. Two minutes is all it takes.
Skip the tourDemo tour, fictional data. For the real software, try the sandbox.
H1V B2V BR for Mehdi Roux: expires tomorrow, Tuesday 13/10.
Scheduled on Wednesday 14/10 at the Lunel plant, cell T2 (PP 2026-0318).
Inès Laurent can replace him.
H2V B2V BR BC valid until 02/03/2027.
ReplaceBook a refresher
PP 2026-0318, Lunel plant: joint inspection tomorrow at 10 am.
With Mr Lefèvre, operator. Signature expected before Wednesday 8 am.
Lucas Fabre, CACES R486 B: expires on 30/10.
Session offered on 22/10 in Montpellier.
October rounds: 22 sites done out of 31.
None overdue so far.
Step 1 of 8
Monday 12 October, 7:10 am
Arnaud Vidal’s home page, before the morning briefing.
Arnaud Vidal, contracts manager in Nîmes, opens Auragide. His home page only shows what needs handling this week.
At the top of the list, a red row: an authorisation that expires before a job.
H1V B2V BR for Mehdi Roux: expires tomorrow, Tuesday 13/10.
Scheduled on Wednesday 14/10 at the Lunel plant, cell T2 (PP 2026-0318).
Lunel, Wednesday 14/10: Inès Laurent replaces Mehdi Roux.
H2V B2V BR BC valid until 02/03/2027. Mehdi Roux booked on the 21/10 refresher. Alert seen at 7:10 am, settled at 7:14 am.
Inès Laurent can replace him.
H2V B2V BR BC valid until 02/03/2027.
ReplaceBook a refresher
PP 2026-0318, Lunel plant: joint inspection tomorrow at 10 am.
With Mr Lefèvre, operator. Signature expected before Wednesday 8 am.
Lucas Fabre, CACES R486 B: expires on 30/10.
Session offered on 22/10 in Montpellier.
October rounds: 22 sites done out of 31.
None overdue so far.
Step 2 of 8
Monday 12 October, 7:10 am
Mehdi Roux’s authorisation expires the day before.
Mehdi Roux’s H1V B2V BR certificate ends on Tuesday, and on Wednesday Mehdi is due to isolate cell T2 at the Lunel plant. The operator refuses entry without a valid certificate.
Auragide suggests Inès Laurent, whose certificate runs until March 2027.
- Site
- Lunel solar plant, 20 kV delivery substation
- Works
- Isolation of cell T2, replacement of the protection relay
- Date
- Wednesday 14/10/2026, from 8 am to 12 pm
- Worker
- Inès Laurent, H2V B2V BR BC until 02/03/2027 Valid
- Risks
- 4 identified: exposed live parts, co-activity with the grounds maintenance contractor, on-site traffic, dust
- Validity
- Until 31/12/2026, reminder on 01/12
SignTime from inspection to signature: 47 minutes.
- 10:53 amPDF sent to Inès Laurent and Mr Lefèvre
- 10:52 amSigned by Mr Lefèvre
- 10:05 amJoint inspection started, 2 participants
Step 3 of 8
Tuesday 13 October, Lunel solar plant
The prevention plan signed on site.
Arnaud Vidal and Mr Lefèvre, the operator, carry out the joint inspection and identify four risks. Arnaud fills in the plan on the tablet during the visit.
All that is left is for both of them to sign before leaving the substation.
Scan an equipment label
Label EQ-LUN-0042 scanned
Cell T2, transformer protection
Work order BI-2026-1187 · Inès Laurent
Corrective actions from the August round
- Replace the protection relay
- Retighten terminal block X2, 2.5 N·m
Step 4 of 8
Wednesday 14 October, delivery substation, Lunel plant
In the field, the label on cell T2.
Inès Laurent is in the delivery substation, with no mobile signal. She scans the label stuck on cell T2 with her phone.
The equipment record opens, with the two corrective actions left by the August round.
Label EQ-LUN-0042 scanned
Cell T2, transformer protection
Work order BI-2026-1187 · Inès Laurent
Corrective actions from the August round
- Replace the protection relay
- Retighten terminal block X2, 2.5 N·m
Close the work orderWork order closed
Step 5 of 8
Wednesday 14 October, 10:41 am
The work order closed with no signal.
The relay is replaced. Inès ticks the two corrective actions, signs with her finger and closes the work order; the phone keeps everything queued.
The work order goes out as soon as the signal returns, in the car park. In Nîmes, the row switches to “Closed” on Arnaud’s screen.
Round done (30)No visit (1)
| Site | Round | Status |
|---|---|---|
| Fréjorgues warehouse, Mauguio | Generator, main LV board | Done at 4:12 pm, T. Garcia |
| Lunel solar plant | Delivery substation | Done on 14/10, I. Laurent |
| Clinique du Parc, Nîmes | Main LV board, emergency lighting | Done on 08/10, M. Roux |
| Media library, Vauvert | Main LV board, emergency lighting | No visitNo visit, planned Friday 8 am |
Media library, Vauvert
Main LV board, emergency lighting · no visit in October
Lucas Fabre, Friday 16/10 at 8 am, on the way to AimarguesAssign
Assigned to Lucas Fabre, Friday 8 am
Step 6 of 8
Thursday 15 October, 4:30 pm
The October round: 30 sites out of 31.
One square per site under contract. Thomas Garcia has just done the Fréjorgues warehouse; only one red is left, the Vauvert media library.
Arnaud sends Lucas Fabre there on Friday at 8 am, on the way to a call-out in Aimargues.
The requested documents are added here, in the order the auditor reads them.
- 2:06 pmOpened
PP 2026-0251, Fréjorgues warehouse
Job of 22/07/2026, signed by both parties, 3 pages
- 2:07 pmOpened
Yanis Morel, joined on 4 May 2026
B1V BR and H0V until 19/05/2029, SST of 20/05/2026
- 2:08 pmOpened
August round, Lunel plant
11/08/2026, I. Laurent, 14 points checked, 2 corrective actions, closed on 14/10
Step 7 of 8
Friday 16 October, 2:00 pm
The MASE audit: three documents requested at random.
The auditor wants a July prevention plan at Fréjorgues, the certificates of Yanis Morel, who joined in May, and proof of the August round at Lunel.
Sabine Rouvière, QHSE manager, looks for them on the tablet. In 2025, the same request took her the whole afternoon.
October rounds, site by site
| Fréjorgues warehouse, Mauguio | Done at 4:12 pm, T. Garcia |
| Lunel solar plant | Done on 14/10, I. Laurent |
| Clinique du Parc, Nîmes | Done on 08/10, M. Roux |
| Media library, Vauvert | Planned Friday 8 am, Lucas Fabre |
Step 8 of 8
October 2026, management dashboard
This month’s management dashboard.
October’s figures on a single screen, for the managing director, and behind each one the list of its rows.
Authorisations up to date have gone from 61% to 94% in twelve months.
Your platform will look like this one.
With your sites and your own words: we build it from your spreadsheets and papers during onboarding.
Demo tour, fictional data. For the real software, try the sandbox.