Skip to content
Try itBook a meetingMeeting

A guided tour of Auragide, in eight screens.

The week at Électricité Vidal & Fils, in Nîmes, from 12 to 16 October 2026: you click where the team clicked. Two minutes is all it takes.

Skip the tourDemo tour, fictional data. For the real software, try the sandbox.

VFHome ›To handle this weekArnaud Vidal
  • H1V B2V BR for Mehdi Roux: expires tomorrow, Tuesday 13/10.

    Scheduled on Wednesday 14/10 at the Lunel plant, cell T2 (PP 2026-0318).

    Inès Laurent can replace him.

    H2V B2V BR BC valid until 02/03/2027.

    ReplaceBook a refresher

  • PP 2026-0318, Lunel plant: joint inspection tomorrow at 10 am.

    With Mr Lefèvre, operator. Signature expected before Wednesday 8 am.

  • Lucas Fabre, CACES R486 B: expires on 30/10.

    Session offered on 22/10 in Montpellier.

  • October rounds: 22 sites done out of 31.

    None overdue so far.

Step 1 of 8

Monday 12 October, 7:10 am

Arnaud Vidal’s home page, before the morning briefing.

Arnaud Vidal, contracts manager in Nîmes, opens Auragide. His home page only shows what needs handling this week.

At the top of the list, a red row: an authorisation that expires before a job.

VFHome ›To handle this weekArnaud Vidal
  • H1V B2V BR for Mehdi Roux: expires tomorrow, Tuesday 13/10.

    Scheduled on Wednesday 14/10 at the Lunel plant, cell T2 (PP 2026-0318).

    Lunel, Wednesday 14/10: Inès Laurent replaces Mehdi Roux.

    H2V B2V BR BC valid until 02/03/2027. Mehdi Roux booked on the 21/10 refresher. Alert seen at 7:10 am, settled at 7:14 am.

    Inès Laurent can replace him.

    H2V B2V BR BC valid until 02/03/2027.

    ReplaceBook a refresher

  • PP 2026-0318, Lunel plant: joint inspection tomorrow at 10 am.

    With Mr Lefèvre, operator. Signature expected before Wednesday 8 am.

  • Lucas Fabre, CACES R486 B: expires on 30/10.

    Session offered on 22/10 in Montpellier.

  • October rounds: 22 sites done out of 31.

    None overdue so far.

Step 2 of 8

Monday 12 October, 7:10 am

Mehdi Roux’s authorisation expires the day before.

Mehdi Roux’s H1V B2V BR certificate ends on Tuesday, and on Wednesday Mehdi is due to isolate cell T2 at the Lunel plant. The operator refuses entry without a valid certificate.

Auragide suggests Inès Laurent, whose certificate runs until March 2027.

VFPrevention plans ›PP 2026-0318To signSigned
Site
Lunel solar plant, 20 kV delivery substation
Works
Isolation of cell T2, replacement of the protection relay
Date
Wednesday 14/10/2026, from 8 am to 12 pm
Worker
Inès Laurent, H2V B2V BR BC until 02/03/2027 Valid
Risks
4 identified: exposed live parts, co-activity with the grounds maintenance contractor, on-site traffic, dust
Validity
Until 31/12/2026, reminder on 01/12
Mr Lefèvre, operatorSignature expected13/10, 10:52 am, on tablet
Arnaud Vidal, Vidal & FilsSignature expected13/10, 10:49 am

SignTime from inspection to signature: 47 minutes.

  1. 10:53 amPDF sent to Inès Laurent and Mr Lefèvre
  2. 10:52 amSigned by Mr Lefèvre
  3. 10:05 amJoint inspection started, 2 participants

Step 3 of 8

Tuesday 13 October, Lunel solar plant

The prevention plan signed on site.

Arnaud Vidal and Mr Lefèvre, the operator, carry out the joint inspection and identify four risks. Arnaud fills in the plan on the tablet during the visit.

All that is left is for both of them to sign before leaving the substation.

10:41 amOffline, 4 queued

Scan an equipment label

EQ-LUN-0042
Scan

Label EQ-LUN-0042 scanned

Cell T2, transformer protection

Work order BI-2026-1187 · Inès Laurent

Corrective actions from the August round

  • Replace the protection relay
  • Retighten terminal block X2, 2.5 N·m

Step 4 of 8

Wednesday 14 October, delivery substation, Lunel plant

In the field, the label on cell T2.

Inès Laurent is in the delivery substation, with no mobile signal. She scans the label stuck on cell T2 with her phone.

The equipment record opens, with the two corrective actions left by the August round.

10:41 amOffline, 4 queuedSynced at 11:02 am

Label EQ-LUN-0042 scanned

Cell T2, transformer protection

Work order BI-2026-1187 · Inès Laurent

Corrective actions from the August round

  • Replace the protection relay
  • Retighten terminal block X2, 2.5 N·m
Sign here with your fingerSigned by Inès Laurent, 10:41 am

Close the work orderWork order closed

Step 5 of 8

Wednesday 14 October, 10:41 am

The work order closed with no signal.

The relay is replaced. Inès ticks the two corrective actions, signs with her finger and closes the work order; the phone keeps everything queued.

The work order goes out as soon as the signal returns, in the car park. In Nîmes, the row switches to “Closed” on Arnaud’s screen.

VFRounds ›October 202630 sites done out of 31 · 16 days left

Round done (30)No visit (1)

SiteRoundStatus
Fréjorgues warehouse, MauguioGenerator, main LV boardDone at 4:12 pm, T. Garcia
Lunel solar plantDelivery substationDone on 14/10, I. Laurent
Clinique du Parc, NîmesMain LV board, emergency lightingDone on 08/10, M. Roux
Media library, VauvertMain LV board, emergency lightingNo visitNo visit, planned Friday 8 am

Media library, Vauvert

Main LV board, emergency lighting · no visit in October

Lucas Fabre, Friday 16/10 at 8 am, on the way to AimarguesAssign

Assigned to Lucas Fabre, Friday 8 am

Step 6 of 8

Thursday 15 October, 4:30 pm

The October round: 30 sites out of 31.

One square per site under contract. Thomas Garcia has just done the Fréjorgues warehouse; only one red is left, the Vauvert media library.

Arnaud sends Lucas Fabre there on Friday at 8 am, on the way to a call-out in Aimargues.

VFMASE audit ›16 October 2026
Person, site, documentFréjorgues JulyYanis Morelround August Lunel

The requested documents are added here, in the order the auditor reads them.

  1. 2:06 pm

    PP 2026-0251, Fréjorgues warehouse

    Job of 22/07/2026, signed by both parties, 3 pages

    Opened
  2. 2:07 pm

    Yanis Morel, joined on 4 May 2026

    B1V BR and H0V until 19/05/2029, SST of 20/05/2026

    Opened
  3. 2:08 pm

    August round, Lunel plant

    11/08/2026, I. Laurent, 14 points checked, 2 corrective actions, closed on 14/10

    Opened

Step 7 of 8

Friday 16 October, 2:00 pm

The MASE audit: three documents requested at random.

The auditor wants a July prevention plan at Fréjorgues, the certificates of Yanis Morel, who joined in May, and proof of the August round at Lunel.

Sabine Rouvière, QHSE manager, looks for them on the tablet. In 2025, the same request took her the whole afternoon.

VFDashboard ›October 202684 employees, 31 sites
94%of authorisations up to date61% twelve months ago
30 of 31sites visited on the October round1 with no visit
3 of 4work orders closed this week1 awaiting a part
0documents missing at the MASE audit7 in 2025

October rounds, site by site

Fréjorgues warehouse, MauguioDone at 4:12 pm, T. Garcia
Lunel solar plantDone on 14/10, I. Laurent
Clinique du Parc, NîmesDone on 08/10, M. Roux
Media library, VauvertPlanned Friday 8 am, Lucas Fabre

Step 8 of 8

October 2026, management dashboard

This month’s management dashboard.

October’s figures on a single screen, for the managing director, and behind each one the list of its rows.

Authorisations up to date have gone from 61% to 94% in twelve months.

Your platform will look like this one.

With your sites and your own words: we build it from your spreadsheets and papers during onboarding.

Book a meetingSee pricing

Demo tour, fictional data. For the real software, try the sandbox.